# Kanban board examples: six boards you can copy

> Six kanban board examples for real work, from personal tasks to hiring and client feedback, each with columns, a WIP limit and the problem it prevents.

Source: https://plexiidesk.com/blog/kanban-board-examples
Topic: Work by task (https://plexiidesk.com/blog/c/work-by-task)
Author: The Plexii team
Published: 2026-11-12

A kanban board (sometimes called a kanban chart) shows work as cards moving through columns, such as To do, Doing and Done, so anyone can see what stage each piece of work is at and where it is stuck. The examples below are six boards you can copy for real work, each with its columns, a work-in-progress limit and the mistake it prevents.

[Download Plexii free](https://plexiidesk.com/download) for Mac or Windows if you want to build these as a Kanban view on a table that also shows as a calendar or Gantt chart.

## The three rules every board below follows

The [Kanban Guide](https://kanbanguides.org/english/) builds kanban on three practices: defining and visualising a workflow, actively managing items in it, and improving it. It defines work in progress as "the number of work items started but not finished". In practice, for a small team or one person, that means:

1. **Columns are stages, not categories.** "Writing" is a stage. "Marketing" is not.
2. **One card is one piece of work** someone can finish.
3. **Limit how much is in progress.** When a column is full, finish something before starting something new.

## 1. Personal task board

**Columns:** Backlog → This week → Doing (limit 2) → Waiting on someone → Done

The **Waiting on someone** column is the useful one. Cards blocked by a reply stop cluttering Doing, and on Friday you can see at a glance who to chase. Limit Doing to two so you stop switching between five half-finished tasks. The card you pull into Doing first should be the [frog for the day](https://plexiidesk.com/blog/eat-the-frog-at-work). [The real cost of context switching](https://plexiidesk.com/blog/context-switching-explained) explains why that limit helps.

**Prevents:** starting everything and finishing nothing.

## 2. Content calendar board

**Columns:** Ideas → Writing (limit 3) → Editing (limit 2) → Scheduled → Published

A fictional example: a small team has two drafts in Writing and two in Editing. Editing is full, so the writer who finishes next helps edit instead of starting a fourth draft. Work flows rather than piles up before the bottleneck. The [free content calendar template](https://plexiidesk.com/blog/free-content-calendar-template) pairs well with this board.

**Prevents:** a pile of finished drafts nobody has time to edit.

## 3. Hiring pipeline board

**Columns:** Applied → Screening → Interview → Reference checks → Offer → Hired / Not progressing

Each card is a candidate. Put the date they entered the column on the card. A candidate who has been in Screening for two weeks is a candidate you are about to lose. The [free recruitment pipeline template](https://plexiidesk.com/blog/free-recruitment-pipeline-template) has the columns ready.

**Prevents:** good candidates going cold in a forgotten stage.

## 4. Sales or client pipeline board

**Columns:** Lead → First conversation → Proposal sent → Negotiating → Won / Lost

Add the next action and its date to every card. A card with no next action is a deal that has stalled. Review the board weekly, right to left: what will close, what is stuck, what needs a nudge.

**Prevents:** proposals that were sent and never followed up.

## 5. Client feedback and design rounds board

**Columns:** Feedback received → Decided → In progress → Ready for client → Approved

Each card is one numbered change request. Moving a card to Decided means you have marked it agreed, out of brief, or needs a question back. The [design feedback rounds guide](https://plexiidesk.com/blog/design-feedback-rounds) shows the full routine.

**Prevents:** round three quietly reopening round one.

## 6. Project delivery board

**Columns:** To do → In progress (limit per person) → In review → Blocked → Done

Use a [work breakdown structure](https://plexiidesk.com/blog/work-breakdown-structure-template) to create the cards, then walk the board in a short stand-up, right to left, asking what is blocking each card in review or in progress. A separate **Blocked** column makes problems visible instead of hiding them inside In progress.

**Prevents:** "nearly done" cards that sit for weeks.

## Kanban board, to-do list or Gantt chart?

| Tool | Shows | Best for |
|---|---|---|
| To-do list | What needs doing | Personal tasks with no stages |
| Kanban board | Where each item is and where work is stuck | Continuous flows: content, hiring, sales, support |
| Gantt chart | When each task starts and ends, and what overlaps | Fixed deadlines with dependent tasks |

Many projects use two: a Gantt chart for the dates, and a kanban board for the day-to-day flow.

## How to set up your first board in 15 minutes

1. **Write the stages** a piece of work goes through, from the moment it arrives to the moment it is done. Five or fewer.
2. **Add a Waiting or Blocked column** if work regularly stalls on other people.
3. **Put every current item on a card.** One line each.
4. **Set one limit** on the column that tends to pile up.
5. **Look at it daily for a week,** then change the columns to match how work really moves.

## Kanban boards in Plexii

Plexii is a [desktop workspace where each task gets its own desk](https://plexiidesk.com/product#desk). A [Table work widget](https://plexiidesk.com/widgets/table) can show the same rows as a Table, List, Cards, Kanban, Calendar or Gantt. The [Kanban view](https://plexiidesk.com/help/table-views) turns a Single select column into lanes, one per option, and each lane's heading shows how many cards it holds, which makes a limit you set easy to keep. Drag a card to another lane and the row's value changes to match. Rows with no value sit in an Unassigned lane.

Because it is one table, a hiring board can switch to a Calendar of interview dates, and a project board can switch to a Gantt chart of the same tasks, without copying anything. For project plans, the Plans [Board view](https://plexiidesk.com/help/plans-views) sorts tasks into To do, In progress, Parked and Done.

More guides on organising work are in the [work by task hub](https://plexiidesk.com/blog/c/work-by-task). To build one of these boards next to the files and notes it is about, [download Plexii free](https://plexiidesk.com/download).

## Common questions

**What is a kanban chart?**
It is another name for a kanban board: columns for each stage of work and cards for each item, moved from left to right as the work progresses.

**What are the basic columns on a kanban board?**
To do, Doing and Done. Most teams add one or two stages that match their work, such as Review or Waiting on someone.

**What is a WIP limit?**
A work-in-progress limit caps how many cards can sit in a column. When the column is full, people finish or help with existing work before starting new work.

**Is kanban only for software teams?**
No. It began in manufacturing at Toyota and works for any flow of work: content, hiring, sales, support, design feedback and personal tasks.

**How many columns should a kanban board have?**
Usually three to six. Too many columns make cards move slowly and the board hard to read.

**Can one table be a kanban board and a calendar?**
In Plexii, yes. A Table widget shows the same rows as a Kanban board, a Calendar or a Gantt chart, so changing one view updates the others.