Skip to content
Focus and follow-through

Eat the frog at work: pick it, size it, and start

Pick the one task that would most change your week, size it so you can start in one sitting, and begin it before you open the rest of the list.

On this page 7 sections

To eat the frog at work, pick the one task that would most change the week if it were finished, make it small enough to start in one sitting, and begin it before you open the rest of the list. That is the whole method. The rest of this guide is how to choose the frog, how to cut it down when it looks too big, and how to start it when you would rather do anything else.

The short meaning is in the glossary entry for eat the frog. This post is the working routine. Download Plexii free for Mac or Windows if you want the frog on its own desk, with a calendar block next to it.

Where the saying comes from

People often attribute "eat a live frog first thing in the morning" to Mark Twain. Quote Investigator found no substantive evidence (opens in a new tab) that Twain wrote or said it. The trail goes back to a remark recorded by the French writer Nicolas Chamfort in the 1790s, about swallowing a toad first so nothing later in the day would seem worse. The line moved into English in the nineteenth century, and only much later was it hung on Twain.

The modern work meaning — do the hardest or most important task first — was popularised by Brian Tracy's book *Eat That Frog!*. The origin story does not change the method. It just means you do not need a famous quotation to start the task you are avoiding.

Pick the frog

The frog is not the noisiest item on the list, and it is not every hard thing you can see. It is the one task that, if finished, would most change the week.

A useful test is: if you only finished one thing today, which finish would you still be glad of on Friday? That is the frog. Everything else can wait until it has been started, or at least until it has a time later in the day.

When several tasks all feel like frogs, sort them rather than starting all of them. The free priority matrix separates urgent from important, and Eisenhower matrix examples show how that looks on a real list. Important and not urgent is usually where the frog lives: the proposal, the analysis, the awkward conversation, the draft only you can write. Urgent and noisy is often someone else's frog.

Write the choice down as an output, not a topic. "Q3 forecast" is a pile. "Send the Q3 forecast spreadsheet with the three assumptions in comments" is a frog you can finish.

One frog is enough. A second one can be lined up, but it does not get a share of the first sitting. If you have to eat two, start with the harder one so the morning is not spent negotiating with yourself.

A fictional example: Maya, a finance analyst, has a full inbox, a 10:30 catch-up, and a forecast the leadership meeting needs on Thursday. The inbox will still be there at 4pm. The catch-up is already in the calendar. The frog is the forecast. She writes it as "Draft the forecast with the three assumptions in comments" and leaves the rest of the list closed until that draft exists.

Size the frog

A frog you cannot start in one sitting is usually a project wearing a task's name. Size it until the first sitting produces something visible.

  • **Name the first output.** A draft, a sent file, a decided number, a booked meeting, a written recommendation. If you cannot name the output, you do not yet have a frog.
  • **Give it a time you can defend.** Sixty to ninety minutes is a good first guess for deep work. If you would need an afternoon, cut the first sitting to "the outline and the first section" or "the numbers and the open questions".
  • **Split work you are waiting on.** "Finish the forecast" may hide "get the regional figures from Sam". The frog is the part that is yours. The request to Sam is a different, smaller action you can do immediately.
  • **Keep the next sitting obvious.** When the block ends mid-way, write one line for the next start: where you stopped, and the first thing to open. How to pick up where you left off is the short method for that line.

If the task is unstarted because it feels too big, you have a sizing problem, not a motivation problem. Cut it until a first output would fit in the next block.

Start the frog

Starting is the part most people skip, usually by "just checking email" first. The frog goes first because the rest of the day is better at eating leftovers than at deep work.

  1. **Close the list.** You already picked. Opening the list again is a way to pick a smaller, easier item.
  2. **Open only what the output needs.** The file, the brief, the last version, not the inbox.
  3. **Start for five minutes.** Write the title, paste the figures, outline the sections. Can't get started? Try a five-minute start is the same idea when the first minute is the hard one. Once five minutes are going, stay for the rest of the block.
  4. **Protect the time.** Put a Busy event on the calendar so colleagues can see it, and name the event after the output. How to block time on your calendar covers the clicks in Google Calendar and Outlook, and time blocking calendar: plan a day you can finish covers what to do when a block breaks.
  5. **Stop at a clean point, not at empty.** When the block ends, leave the next action written down. Do not spend the last ten minutes "just finishing" into your next meeting.

A morning that begins in the inbox rarely reaches the frog. A morning that begins with the frog still has the afternoon for mail, approvals and the second-priority work.

Eat the frog in Plexii

Plexii is a desktop workspace where each task gets its own desk. Give the frog its own desk, put the file, the brief and the notes on it, and leave the rest of your work on other desks so the inbox is not staring at you while you write.

In Focus, you can drag the task onto today's calendar to book a block linked to that desk. Opening the block can start a focus session for as long as you booked, which is a practical way to keep the first sitting on the frog instead of on whatever pinged last.

Keep the routine for a fortnight

  1. **The night before, or at the weekly review,** write tomorrow's frog as a single output and book a block for it.
  2. **Start the block with the frog file already open.** Do not open mail first.
  3. **If you stall,** cut the output in half and do a five-minute start on the smaller piece.
  4. **At the end of the week,** count how many frogs were actually started in the first block. Move the ones that kept slipping to a quieter time, or cut them again.

More guides for getting work moving are in the focus and follow-through hub. To keep the frog on its own desk, with the block next to the file, download Plexii free.

Common questions

**What does eat the frog mean at work?** It means doing your most important or most avoided task first, before the rest of the list. At work, that is usually one named output that would most change the week if it were finished, started in a protected block at the beginning of the day.

**Did Mark Twain say "eat a live frog"?** There is no good evidence that he did. Quote Investigator (opens in a new tab) traces the older toad-or-frog remark to Nicolas Chamfort in the 1790s, and finds the Twain attribution only much later. The work method does not depend on the quotation.

**How do I choose the frog if everything is urgent?** Urgent and important can wait for a short first pass, but the frog is usually the important thing that has no one chasing it yet. Use the priority matrix and pick one output. If two still look equal, start with the harder one.

**What if the frog takes all day?** Then it is too big for one sitting. Name a first output that fits in sixty to ninety minutes, start that, and write the next sitting before you stop. A finished section beats an untouched project.

**Should I eat the frog every working day?** Most days, yes, including short days: pick a smaller frog rather than skipping the habit. On a day that is already full of fixed meetings, book the first gap you control, even if it is 45 minutes after lunch.

**How do I eat the frog in Plexii?** Give the task its own desk, put only that work on it, and drag the task onto the calendar to book a block. Start the block on that desk, and leave a one-line next action if you have to stop early.

All postsMore in Focus and follow-through