Skip to content

Plexii glossary

RAG status

A red, amber or green signal used to summarise project health, always best paired with a reason and next step.

What it means

Red, Amber and Green ratings in status reporting, with the British public-sector usage as the worked reference: GOV.UK, Infrastructure and Projects Authority Annual Report 2023-24 (verified), whose Delivery Confidence Assessment is “an assessment of the likelihood of a project delivering its objectives to time and cost”, with exact Green, Amber and Red definitions, and the earlier move from five ratings to three. Good practice without inventing numbers: a reason and a next step behind every colour, agreed definitions in your team, and never colour alone (accessibility).

The term is most useful as a shared description. It does not remove the need to look at the actual task, evidence or constraint in front of you.

A practical example

Amber is not just a colour: “supplier slipped four days; confirm the revised delivery by Tuesday” tells readers why and what happens next.

Put it into practice

  1. Name the concrete situation before applying the label. RAG status is useful only when it changes a choice, boundary or next action.
  2. Make the state visible: write the owner, time, source or stopping condition down instead of relying on memory.
  3. Review what happened. Keep the part that reduced ambiguity and change the part that added ceremony without helping the work.

How it relates to Plexii

: use a Card or a Field single select on the project desk, and a read-only live view for stakeholders (widget field, share live web view). Link status report builder and status report.

Sources