For architects
Nine days to lodge, and the reports are everywhere.
In Plexii, the DA package gets one desk.
The problem
A development application depends on consultants' reports that arrive in separate emails and council notes that sit in a PDF. With the lodgement date close, you need to see who still owes what without opening every thread.
In the video: “Nine days to lodge the DA. Consultants in separate emails, council's notes in a PDF.”
How PlexiDesk handles it
In PlexiDesk, the DA package gets one desk. A desk is one canvas for one piece of work, and the video tours three of its widgets:
Who owes what
In the video: “Every report, who owes it, and what's late.”
A Table widget tracks every report, who owes it and when it is due, and can show the same rows as a list, cards, Kanban lanes, a calendar or a timeline.
What council said
In the video: “What council asked, and how you're answering.”
A Page widget sets out what council asked and how you are answering each point.
The materials
In the video: “The brick and timber council wants to see.”
The material samples sit on the desk as pictures in a File or link widget, next to the documents they belong with.
When something else comes up
In the video: “Then another client wants a childcare centre downstairs. Switch desks. The DA stays where you left it.”
The other job gets a desk of its own, so switching does not mean packing anything away. In the video, “Juniper Street DA package” stays exactly as it was while “Marlow Lane variation” is open. Open desks sit side by side as tabs in the open items strip, a click apart, and Resume writes a short note on where a desk stands for when you come back to it.
One desk per job, everything in view, like a pin-up wall.
Try it
Try an architect deskThe interactive demo builds a ready-made desk for this kind of work in your browser. Nothing to install.
Or set up the desk yourself from a template: each one lists the widgets it needs and how to set it up in PlexiDesk.
Related reading
- Blog
Keep clients updated without writing another status email
Give clients a window instead of a report: when to use a live view, a snapshot or a copy they can use, and what to keep off a client-facing desk.
- Blog
A simple system for organising project files, notes and links
One home per project, two levels of folders and a habit for finishing: a system for project files, notes and links that works with any tools.
Transcript
Nine days to lodge the DA. Consultants in separate emails, council's notes in a PDF. In Plexii, the DA package gets one desk. Every report, who owes it, and what's late. What council asked, and how you're answering. The brick and timber, council wants to see. Then another client wants a childcare centre downstairs. Switch desks. The DA stays where you left it. One desk per job, everything in view, like a pin-up wall.
Real app footage of a demo desk with sample data. The illustrations and the voice are AI-generated.