Skip to content

For business analysts

Sign-off in three days. Two teams still disagree.

In Plexii, sign-off gets one desk.

How it works on the deskStart from a template

Real app footage of a demo desk with sample data. The illustrations and the voice are AI-generated. 36 seconds, with captions and a transcript.

The problem

Before sign-off the requirements are in a spreadsheet, the evidence is in a report and two teams are disagreeing over email. You need the reasons behind each requirement in view, not in your memory.

In the video: “Three days to sign-off. Requirements in a spreadsheet, evidence in a report, two teams arguing over email.”

How PlexiDesk handles it

In PlexiDesk, sign-off gets one desk. A desk is one canvas for one piece of work, and the video tours three of its widgets:

  1. Every requirement

    In the video: “Every requirement, where it came from, where it stands.”

    A Table widget holds every requirement with where it came from and where it stands, filtered or grouped however the meeting needs.

  2. Why they're in

    In the video: “The top three, traced to the problems they fix.”

    A Diagram widget joins boxes with arrows, here tracing the top requirements to the problems they fix.

  3. The one in dispute

    In the video: “The one in dispute: both sides, and who decides.”

    A Custom block records the disputed requirement as a form: both positions, and who decides.

When something else comes up

In the video: “Then the sponsor wants your analysis. Switch desks, nothing to rebuild. Sign-off waits where you left it.”

The other job gets a desk of its own, so switching does not mean packing anything away. In the video, “Requirements sign-off” stays exactly as it was while “Claims rework analysis” is open. Open desks sit side by side as tabs in the open items strip, a click apart, and Resume writes a short note on where a desk stands for when you come back to it.

Sign-off on one desk, analysis on another.

Try it

Set up the desk yourself from a template: each one lists the widgets it needs and how to set it up in PlexiDesk.

Transcript

Three days to sign-off. Requirements in a spreadsheet, evidence in a report, two teams arguing over email. In Plexii, sign-off gets one desk. Every requirement, where it came from, where it stands. The top three, traced to the problems they fix. The one in dispute: both sides, and who decides. Then the sponsor wants your analysis. Switch desks, nothing to rebuild. Sign-off waits where you left it. Sign-off on one desk, analysis on another.

Real app footage of a demo desk with sample data. The illustrations and the voice are AI-generated.